Engineering Design Gantt chart



1.      Gantt chart

No.
Activity List
Allocated Number of Days
Actual Number of Days Consumed
Note
1.       
Outline Customer Requirements
      1


2.       
Prepare Design Specification
2


3.       
Design compatibility Check
1


4.       
Analysis on Possible Design Variation
3


5.       
Selection of final optimum design
1


6.       
Preparation of  Design Report
2


7.       
Final Presentation 
2


Final Status
12








2.      Costing

For 500units of Cabinet Screw Driver with steel shaft and wooden handle

Cost

Amount ($)
Direct Material Cost
(3*500)
1500
Direct Labor Cost
1000
1000
Manufacturing Cost
900
900
Packaging Tooling & Transportation Cost
(1 * 500)
500
Total Cost
3900
Total Cost Per Unit
7.8

Direct Material Cost list:

1.      Steel shaft wooden handle : $3
2.      Steel Shaft plastic handle : $4
3.      Aluminum shaft wooden handle : $5
4.      Aluminum shaft plastic handle : $5.5
5.      Iron shaft wooden handle : $4
6.      Iron shaft Plastic handle : $4.5



3. Design Report

Contents
Things to do
1. Title Page
1. Precise Design Title
2.Designeers Name
3.Customer Details
2.Acknowledgment
Should includes all the associate companies and personnel related with the design process
3.Summary
1. Brief description of the design
2. Include design problems
3.Further Recommendation
4. List of Contents
Provides page numbers corresponding to the associate titles
5. Introduction
1.Provide background details of the design
2.Should answer why the design was undertaken
6. Specification
Design specification prepared in the previous tasks
7. Design Details
Should contain all the associated analysis and evaluation process utilized to obtain the final design.

Brief specification of the final product.
8. Further Recommendation
If any
9.Conclusion
Should answer how you organized the total design activity and what you have achieved as a learner
10.Appendics
Reference Materials